High-tech systems provide features that low-tech systems cannot come close to matching and they are available to all individuals no matter their age, perceived language stage, or surmised intellectual level at the time of intervention. High-tech systems can provide: Cause & effect level of use.

Minggu, 23 Oktober 2016

Special price US $114.50 Dokio Brand 100W (2Pcs x 50W) Foldable Solar Panel China 18V +10A 12V/24V Controller Solar Battery






Dokio Brand 100W (2Pcs x 50W) Foldable Solar Panel China 18V +10A 12V/24V Controller Solar Battery

[32771666764] The Dokio tempered glassfoldable solar panelintegrates high efficiency monocrystalline silicon solar panels with a rugged aluminum frame. The solar panel has a blue 10A PWM controller on the back. The controller has an easy-to-read display. Equipped with a 3 meter cable and alligator clip, it is a plug-and-play solar system. Advantage: Rainproof, waterproof. Made of tempered glass and aluminum frame, durable and durable. The service life is more than 25 years. It has a very high cost performance. We are specialized in producing solar panels manufacturers, have more than 10 years of production experience and customer experience, a good reputation and a wide range of customer groups Ship from China Sometimes the customs will charge the clearance fees. If you reject the item because of customs clearance, you will have to pay for the shipping cost of the returned item. When the goods arrive at the destination country, please contact the local logistics service provider for customs clearance and delivery. Support Drop-shipping PRODUCTDATA Length 660mm Weight 8.4kg Width 530 mm Main material* Monocrystalline Height 25 mm Frame material Aluminum ERFORMANCE UNDER STANDARD TEST CONDITIONS(STC*) Maximum power Pmax 100 Wp Open circuit voltage Voc 21.60 V Maximum power point voltage Vmpp 18.00 V Short-circuit current I sc 5.81 A Maximum power point current I mpp 5.56 A Profession produce solar panels,Controller,Solar system. R&D team with key technologies, international certification, accept mass customization, processing! Note that the controller on the back is changed to a blue controller. Noted: ​ Due to product upgrades, the appearance of the solar panels has changed, but the functionality remains the same. The solar panels received now will be the styles in the picture. Real product photo FSP-100M FSP-100P ​ Build your own solar system Operating Instruction for Solar Panel Installation and operation of solar cell module a). Climatic Conditions Install PV module according to the following conditions Ambient Temperature: -20℃ to + 40℃. Operating Temperature: -20℃ to + 80℃. Borne Snow Pressure: less than 2000Pa Borne Wind Pressure: less than 3000Pa Water proof: don’t soak the PV module in water or continuously expose it to the sprinkling device or under fountains. Corrosion resistance: except for corrosive salt area and sulfurous area. b). Direction Module shall be installed facing south (northern hemisphere) or north (southern hemisphere).Facing east or west may send only a relatively small amount of electric energy, and incorrect installing orientation will cause a loss in energy output. Series-connected PV module shall be installed in the same direction and with the same angle, because different directions and angles may cause loss of energy due to the differences of solar radiation. Installation of module shall avoid under shadows. Even though the module decreases loss of energy through bypass diode, the shadow will cause loss in energy output. Under normal circumstances, the module generates more current and voltage in routines than in the standardized testing conditions, therefore, please operate the configuration by multiplying 1.25 times of the short-circuit current and open-circuit voltage during the installation and application. c). Installation and Precautions The module must be installed on the roof with fire proof function. Connector for installation and connection needs to obtain the approved certification of connector (VDE V 0126-3). Junction box with the type required by the installation and connection needs to obtain the approved certification of junction box (2 PFG1162). Cables with the type required by the installation and connection need to obtain the approved certification of cables (2 PFG1161). When installing modules in batches, the interval distance between modules shall be larger than 100mm. Firstly, place the solar cell module with certain angle (generally 30° or 45°in horizontal plane), and choose a direction that can let the sunlight directly radiate the solar cell module for more time to place the module. Module and bracket shall be fully contacted with the ground. When installing modules, keep away from ignition source or fuels. Installation structure and bracket must bear external pressures such as wind pressure and snow pressure. Installation structure shall be environment resistant and chosen appropriate materials and preservative treatment. Method for high altitude installation shall be appropriate. High falling may cause death, disability and damages. It is forbidden to disassemble, bend, toss the module, nor shock it by hard objects or walk on it. d). Wire Connection and Precautions Open the junction box, connect the red wire to the positive pole (+) and the black wire to the negative pole (-) and insert the other end to the interface of the solar cell wire of the battery cabinet. Fasten the module on the bracket by fastening piece and module mounting hole, the hardness and intensity of the fastening piece and module bracket must achieve the standard and be in accordance with relevant requirements. Use the private joint provided by the company. Note: short-circuit for positive and negative poles are forbidden. The joint shall be tightened without any clearances; otherwise, the clearances may cause sparks. Check if the fastening part of the installation structure is loosen; otherwise, it must be tightened. Often clear the dust and dirt on the surface of the PV module with soft cloth to prevent the loss in energy output due to the block on the surface of the module. Check frequently if the surface of the module is blocked by objects. Replace modules with the same specifications and the same type products. Be careful not to contact the exposed part of the wire or joint, and if it is necessary, wear the insulator (such as tools, gloves, etc.). During the process of installation and maintenance, be sure to cover the surface of the module with cloth or other light proof materials, because the module will generate high voltage under solar radiation which would be dangerous. Through the highest standards of European testing Our strength guarantees quality and quantity Precision Machining Strict and testing Warehouse Sales Show 



US $200.88

Limited Time 43%  US $114.50

  • Only US $371.60 TRONXY D01 3D Printer Fast Assembly Acrylic Mask OptionalIndustrial Linear Guide Titan Extruder Ult
  • Get now US $238.05 2019 Tronxy Latest upgrade XY-2 PRO 3D Printer DIY Kits Resume Power Failure Printing Fast Assembly
  • Take Now US $184.26 BIQU Legend 3D Printer Upgraded Full Metal SKR V1.3 Control Board TFT35 V2.0 Touch Screen Desktop I
  • Special price US $78.85 Dental Chair Unit Sinora Fona Spare Parts Dental Positioning Valve
  • Get now 4.53 For XGIMI Z4 H1 Remote Control Cover Remote Protection Transparent Waterproof Case Dustproof Silica Gel For XGIMI Z5 H1S CC
  • Tidak ada komentar:

    Posting Komentar